%>


County of Riverside Board of Supervisors Seal with Historic Riverside Court House

In-Progress Projects



 

Jurupa Aquatics Center Facility

Jurupa Valley Aquatics CenterA competition pool with diving boards and platforms, wave rider, lazy river, children’s water playground, water slides, picnic shelters and a terraced landscaped area are among the planned features of the Jurupa Aquatics Center. The new state-of-the-art center will be built on 9-acres at the southeast corner of Camino Real and Mission Boulevard in Glen Avon. The $20 million project will provide much-needed pool space for the Jurupa Unified School District and great recreational opportunities for the entire community. Construction is projected for completion late summer 2010.

El Cerrito Park

El Cerrito Sports Park Conceptual DrawingConstruction of a 26-acre sports park in the El Cerrito area is currently underway. The El Cerrito Sports Park is the ideal recreation area with something for every family member to enjoy. The park will feature two full-size baseball/softball diamonds, two little league baseball/softball diamonds, one T-ball multi-use field, two full size soccer fields, two basketball courts and two tennis courts. Also included in the plans are facility parking, restrooms, tot lots, a concession stand and a space set aside for a future 5,000 sq. ft. community center building.Construction is currently underway and completion is scheduled for Spring 2010

Northwest Riverside County/City Animal Shelter

Rendering of North Riverside Animal ShelterThis joint project of Riverside County and the City of Riverside will include the construction of a 33,000 sq. ft. building with 200 kennels that will house 400 dogs, and 200 bungalows that will house 400 cats. The new facility located on 12.5-acres of land at 6851 Van Buren Boulevard will be able to house as many as 12 horses and a variety of other types of animals. The state-of-the-art animal campus will provide additional shelter and care for both county and city animals. The project is currently under construction and is scheduled for completion in February 2010.

River Road Bridge Replacement - Eastvale/Norco/Corona

The River Road Bridge is located at the westerly boundaries of the cities of Corona & Norco, and crosses over the Santa Ana River into the newly developing community of Eastvale. In March of 1995, the bridge (built back in the 30’s), sustained significant damage during a large storm event, and was determined by Caltrans Office of Structure Maintenance to be functionally obsolete and deficient. Transportation’s determination allowed the County to secure Federal funds for the replacement of the existing bridge, and to begin the very long environmental process required to cross over a major waterway, and determine the replacement alternatives as required by Federal regulations. In December of last year the County was given the environmental clearances to begin the design engineering for the project.

Rubidoux Library and County Library Administration Offices Project

Rendering of the Rubidoux Library and County Library Administration Offices BuildingThis new 40,000 sq. ft, full service, Rubidoux Community Library will provide patrons access to approximately 70,000 books and audiovisual volumes on-site, 25 public catalog access stations, a computer training room with 27 workstations for application uses and internet connection. This modern facility will include 150 reader seats, a meeting room with an attendance capacity of 100 persons, a conference room for smaller group meetings, quiet study areas in the reference department, a children's story room, and a family literacy center. A separate administration area will house the Riverside County Services and Systems staff. Currently under construction, the library will be located off of Riverview Drive and Mission Boulevard in the Community of Rubidoux and is scheduled for completion Spring of 2010.

Vernola Park Project

Vernola Park: Ground being leveledA 20-acre park is currently under construction at the corner of Bellegrave and Wineville Avenues in Mira Loma. The proposed Vernola Park has something for every member of the family. Soccer and baseball fields for the sports lover, a tot lot area for children to take pleasure in, picnic and shade structures along with a concession stand are just a few features available for residents of Mira Loma. In addition to the park amenities, a traffic signal will be installed at the intersection of Bellegrave and Wineville to provide improved safety and traffic flow. The realignment of Wineville Avenue is also part of this beautifully planned neighborhood park. Completion is scheduled for fall 2009. Grand opening in late January 2010.

La Rue Street Sidewalk Improvement Project

A street realignment and sidewalk improvement project from Mustang Lane to La Canada is currently in design. In order to enhance the overall look and improve the safety of the area, new and infill sidewalks, and the preservation of existing trees along La Rue Street will be included in the project. Construction is scheduled to start January 2010 and completed in summer 2010.







Alternative Format Notice: PDF and Word documents provided on this website may be requested in alternative formats for an individual with a disability. To request an alternative format, please call or email our office with the title of the needed document.